Got some flights in this weekend as well as some RV building. While Tad is working on the Right Wing rib prep work and priming the tie-down pieces, I matched drilled all the holes in the Ribs for the left wing to both Front and Rear Spars.
It went pretty smoothly and all the holes lined up better than I remember from the last trial-fit. Anyway, that is done now.
Need to clean up the holes for the Pitot tube grommets and then drill the Conduit Holes for each rib. I'll probably measure out one and then cleco each one to the master and just match drill it with a smaller drill size. Then I will go back with the Step Drill and enlarge them.