Monday, April 13, 2009

Continue Right Elevator

We've had 2 good work days only in the last little while but have most of the right elevator ready to be riveted to the spar.
Yesterday we did all the rivets for the spar, skin stiffeners, nut-plates,etc. The out-board rib to spar rivets gave us some grief. They just wouldn't set straight. So we fussed with that for over an hour i think. So basically we have the Skeleton together and is ready for the skin. We decided to stop there and tackle riveting the skin on a fresh day. We've read and heard it can be tricky to do... or maybe just time consuming as it will be tough to get in there to buck the rivets. We'll see.
Of course in Canada we have pre-close inspections so we'll go as far as possible but all trailing edges will be left open. I hope by mid-may we'll be ready for those inspections and then we'll be over one hurdle.

Right Elevator Spar - Nut-plates riveted on.
From Pete and Tad's RV-9a Build


Right Elevator Inward Rib - Flush rivets used as control horn covers this.
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

Monday, March 16, 2009

Elevator, Day 1

Yesterday, we started on the Elevators. Cutting the stiffeners to size and then match drilling to the Skin. Having two people do this was much easier as the skins for both the top and bottom are one and already formed to shape. We used a bit of tape to assist holding open one side of it then we drilled directly into the board underneath and this held down the opposite side to the table. It worked out pretty well and didn't take too much time at all.
Tad also deburred all the edges of the Right skin while I was cutting out the stiffeners and cleaning up one end of them.
We also matched-drilled the nut-plate reinforcements E910 on the spar and match drilled the counter-balance skins/ribs. Tad did the Fluting on those ribs and got them nice and straight.

Tad has taken the stiffeners to sheer the angle on the one end. They still need to be deburred and primed.

Next we'll do some match drilling of the spar to the skin.

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

Thursday, March 12, 2009

Rudder Progress...

Well, we are still working on the RV... just been a little slow lately because of work mainly. Both Tad and I have been pretty busy but that is a good thing because we are raising $$$ for the next part of the project. WINGS! That will be expensive and the way the exchange is looking, it isn't getting better.
So, we have most of the Rudder ready for inspection...just have a few rivets to get right near the trailing edge of the top rib. Tad is making us a nice custom bucking bar for that.
Folks, you should see Tad's custom tooling he's done already. We had to Dimple a bigger hole for the counter-weight and didn't have one. Tad majically arrived at the next building session with a beautiful dimple die he made at his shop. I was pretty impressed with that and of course it did a perfect dimple! Way to go Tad!
A good airplane building partner is a rare thing i think.

Tad made a nice Back-riveting plate...
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


and of course our modification to reach some particularly difficult rivets!

From Pete and Tad's RV-9a Build

Wednesday, February 11, 2009

Rudder

Spent the last couple of weeks, when time allowed, working on the Rudder. Tad cut and shaped all the stiffeners for the Rudder at his shop and we have match drilled those to the skins. Also, we have assembled the skeleton of the Rudder and fluted, matched drilled those. Next, is deburring the very thin skin and stiffeners and then prime and back-rivet them together.
The Rudder is going together great so far. Taking a bit more time to complete as things have been busy but i am hoping to do a bit more today and then tomorrow night.

We are up to about 68hours so far on this tail kit.

Wednesday, January 28, 2009

Vertical Stabilizer

Well we have completed the Vertical Stabilizer(at least as far as we can go for inspection reasons).
We had a couple of rivets we weren't completely satisfied with so we took those out and have replaced them. The VS went together fairly quickly...always takes lots of time to match drill, debur, prime,etc. We basically assembled the entire VS in two evening shifts. One for the Rear Spar and Skeleton and one for the skin.
We just have two small 3.5 rivets on the Nose rib to do as we don't have a proper, ie small enough, bucking bar to reach in there.
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


Trying to protect the surfaces from scratching.
From Pete and Tad's RV-9a Build

Parts are ready for primer.
From Pete and Tad's RV-9a Build

Rear spar Riveted together.
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build

Almost finished... leaving rear spar off and will cleco it on(for inspection reasons)
From Pete and Tad's RV-9a Build

Next will be Shaping the stiffeners for the Rudder assembly! Tad will probably take those to his shop to shape them up.

Sunday, January 18, 2009

Almost finished it off...

Well, another day in the shop...
We riveted the skin to spar and ribs and almost have it all completed now. We still need to drill out the rear hinge bracket assembly and then it will be ready for inspection. The rear spar is just clecoed on for now.
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build

I have the Vertical fin on the bench now, getting ready to match drill that and then the same process... drill, dimple, prime, rivet.

Monday, January 12, 2009

FIRST RIVETS!!!!!!!!

Well, we have made some great progress on Sunday January 11, 2009. We riveted our first rivets on the RV-9a plane today!
From Pete and Tad's RV-9a Build


From Pete and Tad's RV-9a Build

Tad did a great job on the primer work in his shop and magically arrived on Sunday morning with everything ready for assembly. he spent a couple of hours doing that work so that will be added to the log.
We took a bit of time to read the plans again and dial in the pneumatic squeezer i got from Isham Tools. I don't have the adjustable one so after a few washer settings we gave a shot. At first, we took our time doing them and making sure we have proper shop heads on the rivets. The really nice thing with the squeezer is once you have it set, it provides nice consistent rivets throughout. We drilled out a few(or Tad did) as we didn't get good countersinks and the factory head was slightly high. We just manually did a quick turn of the deburring tool to take it down a bit, then rivet again. Tad was good at getting them out... perfect everytime.

We got as far as assembly of the nose ribs in the skin, then clecoed in the spar and ribs. Hopefully tonight we'll finish off the riveting on the left side!!
I'll post up some pics later when i get them off the camera!

So far we are pleased with the results we are seeing after all the preparation!

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

From Pete and Tad's RV-9a Build

Thursday, January 8, 2009

Doublers

Spent some time working on countersinking the spar doublers, getting the parts ready to prime!! :)
Next will be some riveting!

Sunday, January 4, 2009

Deburring and Dimpling

It's been a while since our last posting. We have been researching the primer type and where to buy this stuff in Cranbrook. Not easy to find.
Tad came by a few days over the holidays and we got more work done on the Stablizer. Also, Tad built a new C-Frame table-top and Curtii was nice enough to give us some carpet for the top. We got both skins dimpled and pretty much ready for primer.
From Pete and Tad's RV-9a Build

Next up will be coutersinking the spar doublers and then prime the parts!
So far over the few days that Tad has come by(Dec 30 and Dec 31 both 3hrs. each), we have put in about 11 hours to be added to the overall.

From Pete and Tad's RV-9a Build

Wednesday, December 3, 2008

Continued Work on HS

Tad stopped by after work today and we got 3.5hrs in on the Horizontal Stabilizer. Now both sections have been assembled and match drilled. Need to debur and dimple and then decide on the priming we want to do.