Friday, March 5, 2010

Conduit Holes, Nose Ribs

I have been trying to get more time in on the RV and have found the mornings, before work, to be the best. Still work on it during evening though, try to leave that to the mundane work. Being tired and trying to decide what the plans call for aren't a good mix.
Anyway, I drilled out the Conduit holes to 3/4" for the Left Wing. Tad still has the Right Wing ribs so i'll do those when he is done. These Ribs are ready for primer now so Tad will tackle that this weekend.
So it's time to do some more deburring. This time onto the Nose Ribs!
From Pete and Tad's RV-9a Build
From Pete and Tad's RV-9a Build
From Pete and Tad's RV-9a Build