Saturday, November 3, 2012

time to seal up the tank by installing the rear baffle along with the z-brackets(attachment to the main spar). before installing the baffle we setup and prepared the van's sending units.
From Pete and Tad's RV-9a Build
From Pete and Tad's RV-9a Build
putting the tank assembly back into the jig, bead of proseal is applied(thanks to Tad's idea of applying this, worked better than we thought:)... just a matter of dropping in the baffle now.
From Pete and Tad's RV-9a Build
From Pete and Tad's RV-9a Build
From Pete and Tad's RV-9a Build

No comments: