Thursday, January 17, 2013

With the majority of the tanks behind us now I carried on with the Ailerons and fixing the leading edge assembly (that we put together at Tad's place) onto the Left Wing Spar. This is a pic of the fuel tank assembly together with the leading edge assembly. Each of these will get riveted to the main skeleton of the wing.
From Pete and Tad's RV-9a Build
Here is the Leading Edge assembly final riveted on the Wing Skeleton. This riveting is virtually blind except for only a few... not easy to do.
From Pete and Tad's RV-9a Build

No comments: